What this does
Timeline puts your story on a calendar. It has two tabs. On Dates you type a date and a timeline label for each scene, in a table that lists every scene in reading order. On Chronology those dates are grouped and laid out on a year axis, so you can see the order events happen in and compare it with the order you tell them. It is built from what you enter and works with AI features off. You don't need to run an analysis. If you do run the manuscript analysis, any dates it reads wait under Pending, above the Dates table, for you to accept. They never go straight onto the Timeline.
Before you start
You need a project with at least one scene. With no scenes, Timeline says there is nothing to lay out yet. Open it from the Plan rail: select Plan, then Timeline. After you date scenes, the Timeline item in the sidebar shows how many are dated.
Enter dates on the Dates tab
Dates lists every scene in reading order, grouped under its chapter. Each field saves when you press Enter or click away.
- Open Plan → Timeline and select the Dates tab.
- Click the Date field for a scene and type when it happens, for example “14 March 1991”.
- Press Enter to save and move to the same field on the next scene. Press Escape to discard what you typed.
- Leave a scene's Date empty to carry the previous date forward. The empty field shows “inherits …” with the date it will use.
- Type a Label if you want a free-text marker such as “Present day”, “Flashback” or “the morning after”. Labels appear in scene headers and exports. They don't sort or group anything, and an empty label carries forward the previous label in the same chapter.
- To find the scenes you still need to date, tick Only show scenes without their own date. Use Collapse all or Jump to chapter… to move around a long book.
Which dates the Timeline understands
The Date field accepts any text. The Chronology tab then reads these parts out of it:
- Year: a four-digit year from 1000 to 2099, or a span such as “1990–1991”.
- Month: a full month name or a short form (Jan, Feb, Mar, Apr, Jun, Jul, Aug, Sep or Sept, Oct, Nov, Dec).
- Season: spring, summer, autumn, fall or winter.
- Day: a number from 1 to 31, with or without st/nd/rd/th. It's read only when it sits next to a month, as in “March 14” or “(December 25)”.
Anything else you write, like “Circa” or “evening”, is kept as a note under the group heading. It doesn't affect sorting. A date without a year takes the year of the dated scene before it. All-number dates such as “14/03/1991” are read as the year only.
Relative dates. A phrase like “the morning after” isn't turned into a date. Put it in the Label and leave the Date empty so the scene inherits the date before it. The only relative phrases the Timeline reads are month or year offsets such as “six months later”, “two years later” or “a year and a half later”, when they appear in a date that also names a month. It uses them to place the date group before that one if that group has no month of its own. This only affects order. The group's heading doesn't change.
Read the Chronology tab
- Select the Chronology tab. It opens in Chronological order with the Years lens.
- Look at the year axis. Each year card shows its scene count and a bar for each date group. In chronological order, years with no scenes appear as dashed slivers. Scenes with no year of any kind go in an Undated card after the calendar.
- Select a year to show its date groups below. Each group lists its scene cards, and each card says whether that scene has its own date or inherited one.
- Select a scene card to open that scene in the editor.
Compare reading order and chronological order
- In the toolbar, switch the Order toggle between Chronological (the order events happen) and Reading order (the order scenes appear in the manuscript).
- Read the line at the right of the toolbar. It shows how many date groups and scenes change position between the two orders, for example “12 of 30 date groups move between the two orders · 62 of 159 scenes”. If nothing moves, it says the two orders agree. It appears once there are at least two date groups.
Switch between normalized and as-written dates
The date labels toggle has two settings, Normalized and As written. Older docs call them refined and original labels.
- Choose Normalized to see each date in a standard form: “March 14, 1991”, “March 1991”, “Spring 1991”, or just “1991”. Dates for the same period are merged into one group. A ≈ mark means the date is known only to the season or year, and the rest of what you wrote shows underneath.
- Choose As written to see each date exactly as you typed it, with nothing parsed or merged. Use this to check what Normalized made of a date.
Use the Characters lens
- Switch the Lens toggle from Years to Characters.
- Read the Character threads grid. There's one lane per point-of-view character, heaviest first, with scenes that have no POV in the last lane. Each date group is a column. A filled cell shows how many of that character's scenes fall in that group.
- Check the summary above the grid. It shows how many cells hold a scene, out of the total.
- Select a column header or a cell to show that date group's scenes below.
Tag timeline types and use the Strands lens
- On the Dates tab, set each scene's Type: Outer Frame (the story that tells or wraps the main one), Story Present (the story's now), Past Strand or Future Strand (set before or after the story present), or Outside Time (dreams, myths, interludes with no date). You can also set it while writing, under Scene Info in the Details drawer. It's yours to set — nothing infers it, and it works with analysis switched off.
- On Chronology, switch the Lens toggle to Strands.
- Read the Strands grid. There's one lane per timeline type, always in that order, with untagged scenes in an Untagged lane of their own. Each date group is a column, and a filled cell shows how many of that type's scenes fall in it.
- Check the line above the grid. It says how many scenes carry a type, and Tag them on the Dates tab takes you back to finish tagging.
Print the timeline
- With Timeline open, select the Print button in the toolbar, or choose File → Print… (⌘P on Mac, Ctrl+P on Windows).
- In the system print dialog, choose a printer, or choose Save as PDF.
What you get
You get a calendar of your book. The year axis shows where the story spends its time and which years it skips. Date groups show exactly which scenes share a date. The order line tells you how far the chronology departs from the reading order, the Characters lens shows whose thread runs when, and the Strands lens shows how your timelines braid.
Undated scenes. Until at least one scene has a date, Chronology has no axis. It lists your scenes grouped by chapter, with a line explaining why. In that list, each scene's dot is sized by its word count, and the dot's color shows its POV character. Once one scene is dated, the calendar replaces the chapter list. Scenes before the first dated scene go into an undated group.
Printout. The printed Timeline is grouped by date in reading order, with normalized headings, whatever the on-screen toggles are set to. Each group shows how precisely its date is known and how many of its scenes are dated. Each scene line lists its chapter, word count, POV and location. With no dates, the printout is grouped by chapter and says so.
If you use analysis
Analysis never writes a date or timeline label onto your scenes. The manuscript analysis records what it reads as a proposal. Proposals wait in a Pending group above the table on the Dates tab, where each one can be accepted or rejected. Accepting one sets it as the scene's date, just as if you'd typed it. When proposals are waiting, the Timeline header shows an n pending on Dates link that takes you there. The link is hidden when the analysis feature is switched off. Dates you type yourself on the Dates tab close the matching Pending item.
Common problems
The Chronology tab shows chapters, not dates. No scene has a date yet. The toolbar line says whether nothing has been dated or analysis has run and found none. Add dates on the Dates tab.
A scene lands in the wrong year or group. A date with no year takes the year of the dated scene before it. A word that is also a month or season name, like “may” or “fall”, is read as that month or season. Switch the labels toggle to As written to see the raw text, then edit the date on the Dates tab.
“The morning after” sorts to the middle of the year. Relative phrases aren't dates. A Date field holding only such a phrase gets the previous year and no month. Clear the Date so the scene inherits the date before it, and put the phrase in the Label.
A numeric date shows only the year. The Timeline doesn't read all-number dates like “14/03/1991” as a month and day. Write the month as a word: “14 March 1991”.
A group is headed “No calendar date”. None of its dates contains a year, month or season, and there's no earlier year to inherit. The group shows your text under “As written”. Add a year to its first date.
The Characters lanes show “n names in your scenes aren't in your cast”. Some POV names couldn't be matched to a character. Select Review in Characters to match them in its Pending group.
